A Michigan judge Wednesday allowed Enbridge to resume pumping oil through a Midwestern pipeline, nearly a week after shutting it down because of damage to a structure that anchors a section of the line running through a Great Lakes channel.
Enbridge’s Line 5 moves crude oil and liquids used in propane from Superior, Wisconsin, to Sarnia, Ontario, passing through parts of Michigan’s upper and lower peninsulas. A four-mile-long (6.4-kilometers-long) segment divides into two pipes that cross the bottom of the Straits of Mackinac, which connects Lakes Huron and Michigan.
Read More